As you draw up your curtains, the scenic Toba Bay appears infront of you.
Variety of room types and facilities make your Ise-Shima trip nice.

Location

Toba Seaside Hotel,
the onsen resort hotel that has the best location to revel in the scenic Toba Bay and explore the historical Ise Jingu.

Located in Toba, Mie, not only the perfect location to help your Ise pilgrimage, but also a great stop before heading for Osaka, Kyoto or Nara.

Map

Hotspring

Hotspring
Hotspring
Hotspring
Hotspring
Hotspring

The onsen hopping with the view enjoying of Toba Bay

The spacious Kazami-no-yu; Misaki-no-yu which has the closest scenery of Toba Bay; and last but not least,
Migiwa-no-yu which has various spa facilities to luxuriate in, all awaits for you to start your hopping.

Misaki-no-yu

The onsen with the closest location to Toba Bay

The petite comfortable Misaki-no-yu, which has both inner and outer onsen, has the closest location to Toba Bay.

Kazami-no-yu

The onsen that has the best location to observe Toba Bay

The open air bath with stone bath, hinoki cypress bath, and Japanese jar bath to enjoy in the scenic Toba Bay.

Migiwa-no-yu

The onsen with various spa facilities

Jaccuzzi, Lie-down Baths, and saunas to have a refresh.

Opening Hours

Opening Hours Kazami-no-Yu14:00~24:00/5:30~10:00
Misaki-no-Yu14:00~24:00/5:30~9:00
Migiwa-no-Yu12:00~24:00/5:30~10:00
※Opening hours may change due to maintenance.

5 various styles to maintain your private time with your family.
※Reservations needed

Opening Hours 15:00~23:00
(22:00 last reception)
Price 3,300yen(+tax)
/ per 60 mins.

Rental Private Bath

Rental Private Bath

Rental Private Bath

Rental Private Bath

Rental Private Bath

Cuisine

Cuisine
Cuisine
Cuisine
Cuisine
Cuisine

Dinner choices for buffet and Kaiseiki

Shiki Dinner Buffet with 50 kinds of Japanese-Western-Chinese style cuisines.
Shiki Kaiseki for an experience of exclusive Japanese style dinner in a private space.
Both may give you the most luxurious appetite of Toba.

Shiki Buffet
Shiki Buffet
Shiki Buffet
Shiki Buffet
Shiki Buffet

Shiki Buffet

Various choice of local dishes and desserts.

This open kitchen provides Teppanyaki, Japanese fried foods, Sashimi, Sushi, local noodles and many more. An interactive space to enjoy your cuisines.

tempura

viking

Shiki Kaiseki
Shiki Kaiseki
Shiki Kaiseki
Shiki Kaiseki

Shiki Kaiseki

A luxury experience try for Ise-ebi (Japanese spiny lobster), Abalone, Matsusaka beef, and many more local cuisines of Toba.

Shiki Kaiseki is your only choice for an Ise-Shima style gourment.

Shiki Kaiseki

food Scenery

Breakfast

Breakfast

A Japanese-Western style breakfast buffet, freshly made to start up a new day of your trip.

Rooms

Free WIFI for use

  • Rooms of
    Migiwa-kan
  • Rooms of
    Nozomi-kan
  • Rooms of
    Misaki-tei

Swipe down

Modern Japanese Room

  • Non-smoking Rooms

    Non-smoking
    Rooms

Modern Japanese Room

This exclusive six rooms is located at the top floor of Migiwa-kan, which has two single beds in each rooms. The spacious rooms give you a gracious experience of the sea breeze of Toba Bay, recommended for memorable trips.

The Width of the Room Japanese room:
32.53 sq m Twin Bed
Capacity of People 2~4 people

Floor Plan

↑ Toba Bay ↑

Floor Plan

Tenku Floor has the most spacious experience and the view of beautiful Toba Bay.
Booking Teku Floor Plan will be able to have an exclusive Japanese Kaiseki Style dinner at a private dinning space.

Swipe down

  • 01 Welcome Drink Service

    Welcome Drink Service

  • 02 Exclusive Mikimoto Cosmetic bath & shower sets

    Exclusive Mikimoto Cosmetic bath & shower sets

  • 03 Bottled Mineral Waters

    Bottled Mineral Waters

  • 04 Exclusive Japanese Socks (Tabi)

    Exclusive Japanese Socks (Tabi)

  • 05 Exclusive Japan made Imabari Towels

    Exclusive Japan made Imabari Towels

Total of rooms 206 rooms
Equipments and
Amenity Goods
Television・Satellite Broadcast・Telephone・Electric Hot Water Heating Pot・Tea Drinking Set・Refrigerator・Hair Dryer・Air-conditioner・Electric toilet seat・Two-in-one Shampoo (Migiwa-kan「Tenku Floor」provides exclusive shampoo and conditioner)・Body Soap・Tooth Brush Set・Razor Blade・Plastic Comb・Towel・Bath Towel・Yukata・Slippers・Safes
Check-in/
Check out
15:00(until 19:00)/ 10:00

Suite Room

  • Non-smoking Rooms

    Non-smoking
    Rooms

Exclusive Suite Room

This only room contains both Japanese style and Western style living rooms. Recommened for you to add a bit of luxurious in your grand trip.

The Width of the Room Japanese room: 19.5 sq m + 10.84 sq m Western room: Twin Bed
Capacity of People 2~6 people

Floor Plan

↑ Toba Bay ↑

Floor Plan

Total of rooms 206 rooms
Equipments and
Amenity Goods
Television・Satilite Broadcast・Telephone・Electric Hot Water Heating Pot・Tea Drinking Set・Refridgerator・Hair Dryer・Air-conditioner・Washlet・Two-in-one Shampoo (Migiwa-kan「Tenku Floor」provides exclusive shampoo and conditioner)・Body Soap・Tooth Brush Set・Razor Blade・Plastic Comb・Towel・Bath Towel・Yukata・Slippers・Safes
Check-in/
Check out
15:00(until 19:00)/ 10:00

Standard Room

  • Non-smoking Rooms

    Non-smoking
    Rooms

Standard Room

Migiwa-kan's standard rooms are all rooms with ocean view, the best location to observe Sakate Island. Each room contains two sinks in the washroom. Recommended for your family grand trip.

The Width of the Room 18.07 sq m + 4.34 sq m
Capacity of People 2~6 people

Total of rooms 206 rooms
Equipments and
Amenity Goods
Television・Satilite Broadcast・Telephone・Electric Hot Water Heating Pot・Tea Drinking Set・Refridgerator・Hair Dryer・Air-conditioner・Washlet・Two-in-one Shampoo (Migiwa-kan「Tenku Floor」provides exclusive shampoo and conditioner)・Body Soap・Tooth Brush Set・Razor Blade・Plastic Comb・Towel・Bath Towel・Yukata・Slippers・Safes
Check-in/
Check out
15:00(until 19:00)/ 10:00

Nozomi-kan Special Suite

  • Non-smoking Rooms

    Non-smoking
    Rooms

Nozomi-kan Special Suite

This room type has a Japanese style living room and bed room (with two single beds). A roomy choice for your family grand tour.

The Width of the Room 18.07 sq m + 4.34 sq m
Capacity of People 2~6 people

Floor Plan

↑ Toba Bay ↑

Floor Plan

Total of rooms 206 rooms
Equipments and
Amenity Goods
Television・Satilite Broadcast・Telephone・Electric Hot Water Heating Pot・Tea Drinking Set・Refridgerator・Hair Dryer・Air-conditioner・Washlet・Two-in-one Shampoo (Migiwa-kan「Tenku Floor」provides exclusive shampoo and conditioner)・Body Soap・Tooth Brush Set・Razor Blade・Plastic Comb・Towel・Bath Towel・Yukata・Slippers・Safes
Check-in/
Check out
15:00(until 19:00)/ 10:00

Japanese-Western-style Room

  • Non-smoking Rooms

    Non-smoking
    Rooms

Japanese-Western-style Room

This room type has a comfortable bedroom (with two single beds) and a Japanese style living room. A reasonable choice for your stay.

The Width of the Room 14.45 sq m +Twin Bed +Twin Bed
Capacity of People 2~7 people

Floor Plan

↑ Toba Bay ↑

Floor Plan

Total of rooms 206 rooms
Equipments and
Amenity Goods
Television・Satilite Broadcast・Telephone・Electric Hot Water Heating Pot・Tea Drinking Set・Refridgerator・Hair Dryer・Air-conditioner・Washlet・Two-in-one Shampoo (Migiwa-kan「Tenku Floor」provides exclusive shampoo and conditioner)・Body Soap・Tooth Brush Set・Razor Blade・Plastic Comb・Towel・Bath Towel・Yukata・Slippers・Safes
Check-in/
Check out
15:00(until 19:00)/ 10:00

Standard Room

  • Non-smoking Rooms

    Non-smoking
    Rooms

Standard Room

The standard room of Nozomi-kan. A fair choice for a Japanese style room. Some rooms doesn't have ocean views, but another affordable choice for you.

The Width of the Room 14.45 sq m
Capacity of People 2~5 people

Total of rooms 206 rooms
Equipments and
Amenity Goods
Television・Satilite Broadcast・Telephone・Electric Hot Water Heating Pot・Tea Drinking Set・Refridgerator・Hair Dryer・Air-conditioner・Washlet・Two-in-one Shampoo (Migiwa-kan「Tenku Floor」provides exclusive shampoo and conditioner)・Body Soap・Tooth Brush Set・Razor Blade・Plastic Comb・Towel・Bath Towel・Yukata・Slippers・Safes
Check-in/
Check out
15:00(until 19:00)/ 10:00

Deluxe Room

  • Non-smoking Rooms

    Non-smoking
    Rooms

Deluxe Room

The room type for you and your family to experience a lively and roomy space.

The Width of the Room 18.07 sq m + 6.51 sq m
Capacity of People 5~8 people

Floor Plan

↑ Toba Bay ↑

Floor Plan

Total of rooms 206 rooms
Equipments and
Amenity Goods
Television・Satilite Broadcast・Telephone・Electric Hot Water Heating Pot・Tea Drinking Set・Refridgerator・Hair Dryer・Air-conditioner・Washlet・Two-in-one Shampoo (Migiwa-kan「Tenku Floor」provides exclusive shampoo and conditioner)・Body Soap・Tooth Brush Set・Razor Blade・Plastic Comb・Towel・Bath Towel・Yukata・Slippers・Safes
Check-in/
Check out
15:00(until 19:00)/ 10:00

Western-style Room

  • Non-smoking Rooms

    Non-smoking
    Rooms

Western-style Room

The room type for an affordable choice for beds.

The Width of the Room 17㎡
Capacity of People 2 people(+Extra Bed)

Total of rooms 206 rooms
Equipments and
Amenity Goods
Television・Satilite Broadcast・Telephone・Electric Hot Water Heating Pot・Tea Drinking Set・Refridgerator・Hair Dryer・Air-conditioner・Washlet・Two-in-one Shampoo (Migiwa-kan「Tenku Floor」provides exclusive shampoo and conditioner)・Body Soap・Tooth Brush Set・Razor Blade・Plastic Comb・Towel・Bath Towel・Yukata・Slippers・Safes
Check-in/
Check out
15:00(until 19:00)/ 10:00

Rooms with
Open air bath

  • Non-smoking Rooms

    Non-smoking
    Rooms

Rooms with Open-air Bath

The best room type to enjoy in the onsen while with the breeze of Toba Bay. The terrace also plenty of space to relax after having your onsen bath. This kind of room type has a peaceful Japanese Folk Art settings. Barrier-free with two single beds room is also available.

※We will arrange you to connecting rooms if you book 2 rooms per booking.

The Width of the Room 14.45 sq m・18.07 sq m
Capacity of People 2~5 people

Japanese Room

Japanese Room

Japanese Room with Bed

Japanese Room
with Bed

Western-style Room

Western-style Room

Total of rooms 206 rooms
Equipments and
Amenity Goods
Television・Satilite Broadcast・Telephone・Electric Hot Water Heating Pot・Tea Drinking Set・Refridgerator・Hair Dryer・Air-conditioner・Washlet・Two-in-one Shampoo (Migiwa-kan「Tenku Floor」provides exclusive shampoo and conditioner)・Body Soap・Tooth Brush Set・Razor Blade・Plastic Comb・Towel・Bath Towel・Yukata・Slippers・Safes
Check-in/
Check out
15:00(until 19:00)/ 10:00

Suite Room

  • Non-smoking Rooms

    Non-smoking
    Rooms

Exclusive Suite Room

The suite room of Misaki-tei is cornered at the 5th and 6th floor. An appreciatable choice for your family grand trip.

The Width of the Room ・18.07 sq m + 18.07 sq m
+Living Room
・18.07 sq m + 6.51 sq m
+Western-style Room+Living Room1
Capacity of People 5Floor…2~6 people/
6Floor…2~8 people

Floor Plan

↑ Toba Bay ↑

Floor Plan

Please dial for further more information

TEL:+81 599-25-8181

【Reception Hours】9:00~19:00

<
Total of rooms 206 rooms
Equipments and
Amenity Goods
Television・Satilite Broadcast・Telephone・Electric Hot Water Heating Pot・Tea Drinking Set・Refridgerator・Hair Dryer・Air-conditioner・Washlet・Two-in-one Shampoo (Migiwa-kan「Tenku Floor」provides exclusive shampoo and conditioner)・Body Soap・Tooth Brush Set・Razor Blade・Plastic Comb・Towel・Bath Towel・Yukata・Slippers・Safes
Check-in/
Check out
15:00(until 19:00)/ 10:00

Japanese Room with Bed

  • Non-smoking Rooms

    Non-smoking
    Rooms

Japanese Room with Bed

Reopened in March, 2019. The Japanese Room with Bed Type of Misaki-tei uses the luxury Ryukyu Tatami flooring, an acceptable choice for your family grand trip.

The Width of the Room 18.07 sq m・21.68 sq m・
26.01 sq m
Capacity of People 2~5 people

Total of rooms 206 rooms
Equipments and
Amenity Goods
Television・Satilite Broadcast・Telephone・Electric Hot Water Heating Pot・Tea Drinking Set・Refridgerator・Hair Dryer・Air-conditioner・Washlet・Two-in-one Shampoo (Migiwa-kan「Tenku Floor」provides exclusive shampoo and conditioner)・Body Soap・Tooth Brush Set・Razor Blade・Plastic Comb・Towel・Bath Towel・Yukata・Slippers・Safes
Check-in/
Check out
15:00(until 19:00)/ 10:00

Standard Room

  • Non-smoking Rooms

    Non-smoking
    Rooms

Standard Room

The standard room of Misaki-tei has the closest view of Toba Bay. The lullaby of the waves and the freshness of the sea breeze would definitely be the perfect choice for your trip.

The Width of the Room 14.45 sq m・18.07 sq m・
21.68 sq m
Capacity of People 2~6 people

Total of rooms 206 rooms
Equipments and
Amenity Goods
Television・Satilite Broadcast・Telephone・Electric Hot Water Heating Pot・Tea Drinking Set・Refridgerator・Hair Dryer・Air-conditioner・Washlet・Two-in-one Shampoo (Migiwa-kan「Tenku Floor」provides exclusive shampoo and conditioner)・Body Soap・Tooth Brush Set・Razor Blade・Plastic Comb・Towel・Bath Towel・Yukata・Slippers・Safes
Check-in/
Check out
15:00(until 19:00)/ 10:00

Facilities

Facilities

Facilities

Facilities

Facilities

Various kinds of leisure facilities are available

Souvenir Shop with assorted products of Ise-Shima, Karaokes, Izakaya (Japanese tavern),
swimming pools(summer only) and more to fufill your stay.

Sightseeing

Sightseeing Ise Jingu and other well- known facilities, Toba Seaside Hotel is your best choice.

The most sacred place
since 2000 years ago

Ise Jingu Shrine

A jinja dedicated to Amatera-Omikami, which symbolizes as the guardian of Japan. It was enshrined about 2000 years ago, which every scenery surrounding Jingu maintains the sacred atmosphere.

Estimated Time 30mins. by car

Toba Aquaruim

The Toba Aquarium keeps approximately 30,000 creatures of 1,200 species from the sea and river, which is the largest aquaruim in Japan. In particular, this is the only place in Japan where dugong, capybara and fishing cats.

Estimated Time 7mins. by car

Mikimoto Pearl Island

Mikimoto Pearl Island, visited by many first ladies in the past, is the very first place in the world that succeeded in culturing pearls. On the island, there are facilities such as the Pearl Museum, and you will also be able to watch the diving demonstration by "Ama" (women divers) wearing their traditional white diving costume.

Estimated Time 9mins. by car

Futami Okitama Shrine

The site of The Futami Okitama Shrine is a recommended sightseeing place, where many people go around together for visiting Ise Jingu Shrine. In May to July (especially around the summer solstice), it is possible to see the sunrise from among the couple rocks.

Estimated Time 20mins. by car

Okage Yokocho

Okage Yokocho has a beautiful array of architecture dating from the Edo and Meiji periods thereby creating a delightful and historical atmosphere. Visitors to Okage Yokocho can experience delicious local foods, Japanese history and culture, traditional local customs and the heartening kindness that is famous in Ise.

Estimated Time 26mins. by car

Shima Spain Village

Reminiscent of the exotic atmosphere of a Spanish townscape and brimming with Spanish charm. This theme park features all sorts of attractions, shows, restaurants, and shops.

Estimated Time 30mins. by car

Iruka Island

A remote island featuring all sorts of shows and interaction activites with these cute dolphins.

Estimated Time 11mins. by car

Ise Sea Paradise

An aquarium that allows you to look at the animals closely, and touch them. There are plenty of attractions such as the walruses which are experts at dynamic throwing kisses, performances by cute sea lions, the seals' touch and the yet unexperienced handshake with aonyx capensis.

Estimated Time 17mins. by car

Ise Ninja Kingdom

A theme park representing Azuchi-Momoyama Era (approx. 1558-1600 CE), starting from the reconstruction of the famous Azuchi Caslte and all sorts of ninja shows and oiran theatres to explore the ancient times of Japan.

Estimated Time 17mins. by car

Mie Children's Castle

This amusement park in Matsusaka. Has plenty of activities such as planetarium, wall climbing,and handicraft workshops for kids to enjoy.

Estimated Time 55mins. by car

Isewan Ferry

The 55 mins. by-pass ferry between Toba, Mie to Irago, Aichi.

Estimated Time 8mins. by car

Access

Access

Facility Name Toba Seaside Hotel
Address 1084, Arashimacho, Toba City, Mie Prefecture 〒517-0021
Tel. +81 599-25-8181
【Reception Hours】9:00~19:00

  • Train
  • Airplane
  • Car

Swipe down

By Train

How to get there by train

Osaka

1hr(s.) 55min.s by Kintetsu Limitied Express

Kintetsu Toba Sta.

10 mins.
by free shuttle bus

Toba Seaside Hotel

Kyoto

2hr(s.) 15min.s by Kintetsu Limitied Express

Kintetsu Toba Sta.

10 mins.
by free shuttle bus

Toba Seaside Hotel

Nagoya

1hr(s.) 40min.s by Kintetsu Limitied Express

Kintetsu Toba Sta.

10 mins.
by free shuttle bus

Toba Seaside Hotel

Tokyo

1hr(s.) 40min.s by Shinkansen

Nagoya Sta.

1hr(s.) 40min.s by Kintetsu Limitied Express

Kintetsu Toba Sta.

10 mins.
by free shuttle bus

Toba Seaside Hotel

By Airplane

How to get there by plane

Chubu Centraair
International Airport

Meitetsu Railway in about 30 mins.

Nagoya Sta.

1hr(s.) 40min.s by Kintetsu Limitied Express

Kintetsu Toba Sta.

10 mins.
by free shuttle bus

Toba Seaside Hotel

Kansai International
Airport

Nankai Railway in about 40 mins.

Namba Sta.

Takes 8 minutes walking from

Osaka Namba Sta.

2hr(s.) by Kintetsu Limitied Express

Kintetsu Toba Sta.

10 mins.
by free shuttle bus

Toba Seaside Hotel

By Car

To set the destination in a car navigator, please use
+81 599-25-5151

How to get there by car

Osaka passes through
Nishi-Meihan・Meihan Expressway

Nishi-Meihan・Meihan Expressway in about 1hr 50 mins.

Seki Junction

50min.s by Ise Expressway

Ise Intersection

10min.s by Ise Futami Toba Line

Toba Intersection

Toba Seaside Hotel

Osaka passes through Meishin Expressway

Meishin Expressway in about 1hr

Kusatsu Junction

Shin-Meishin Expressway in 35 mins.

Kameyama Junction

Ise Expressway in about 1hr

Ise Intersection

10min.s by Ise Futami Toba Line

Toba Intersection

Toba Seaside Hotel

Nagoya passes through Meishin Expressway

50min.s by Higashi-Meihan Expressway

Kameyama Junction

Ise Expressway in about 1hr

Ise Intersection

10min.s by Ise Futami Toba Line

Toba Intersection

Toba Seaside Hotel

Tokyo passes through Toyota Junction

Tomei Expressway in about 3hr 20 mins.

Toyota Junction

Isewangan Expressway in 35 mins.

Yokkaichi Junction

Higashi-Meihan Expressway in about 30 mins.

Kameyama Junction

Ise Expressway in about 1hr

Ise Intersection

10min.s by Ise Futami Toba Line

Toba Intersection

Toba Seaside Hotel

Tokyo passes through
Hamamatsu-nishi Intersection

Tomei Expressway about 2hr 40 mins.

Hamamatsu-nishi Intersection

National Route 1, National Route 42 in about 1hr 50 mins.

Cape Irago

Isewan Ferry

Toba Harbor

Toba Seaside Hotel

Free Shuttle Bus

The hotel shuttle bus departs from Toba Station to hotel every 30 mins. It takes about 10 mins. to reach the hotel.

Free Shuttle Bus

The hotel shuttle bus departs at Exit 1, the east side of Toba Station.

Map of the shuttle bus stop


The time schedule of shuttle bus(To Hotel)

The time schedule of shuttle bus(To Toba Sta.)

※Due to road conditions, the hotel shuttle bus may not arrive or depart on time. Thank you for your cooperation.

01

After exiting the ticket gate, please turn left

After exiting the ticket gate, please turn left

02

Please head for Exit 1

Please head for Exit 1

03

Please go down stairs to the 1st floor

Please go down stairs to the 1st floor

04

The hotel shuttle bus stop is right in front of you

The hotel shuttle bus stop is right in front of you

05

The shuttle bus awaits for you

The shuttle bus awaits for you

Information

watch

Check-in
15:00
Check-out
10:00

Translation

English speaking
staff available

Parking

Parking lot available
max 30 motorcoaches/
max 200 automobiles

Credit Card・
Cashless Payment
VISA/American Express/Diner's Club/UC/DC/Master Card/Debit Card/paypay/Alipay
Cancel Policy You will be required to pay a cancellation fee due to the following situations:
On the reservation date: 100%
Before the reservation date: 50%
3 days before the reservation date: 30%
Barrirer-free Faclilities Wheelchairs available/ Barrier-free restroom available

For reservations please dial for

+81 599-25-8181

(Reception Hours 9:00~19:00)